📍Cheyney, PA
Project Scope: Installed new water main, completed sewer and stormwater drainage systems, and constructed new curb and sidewalk
📍Huntingdon Valley, PA
Project Scope: 2″ mill and pave over 7,994 Sq Yd, Installed 6.5′ x 6″ concrete-filled steel pipe bollard, Excavated trench up to 18″ deep, backfilled with stone and asphalt, and installed 4″ asphalt with hot tar edges
📍Phoenixville, PA
Project Scope: 2″ Mill & Pave of Community Roadways and Parking Lot, Drain Inlet Replacements throughout community, ADA Repairs, Line Striping
📍Philadelphia, PA
Project Scope: 2″ overlay on milled surface, Sidewalk replacement (5″), Curb installation (6″ standard & 4″ surmountable), ADA ramps (Type 1A), Decorative concrete bollards
📍Lancaster, PA
Project Scope: 2″ Mill and Pave, Installed new wheel stops, Line striped the entire lot and road
📍Pottsville, PA
Project Scope: Excavated 9.5″ concrete + 6″ stone, Installed geogrid + 6″ crushed aggregate, Used concrete fiber reinforcement and concrete caulking, Heavy Duty Paving which included removing a 14″ section, installing geogrid, adding 7″ stone base + 5″ asphalt binder
📍Harrisburg, PA
Project Scope: 2″ Pave, Applied acrylic resurfacer followed by multiple color coats, Line Striped court, Installed concrete curbs
Lowe’s Store (Jackson) – 1.5″ Mill and Pave, Line Striped entire lot, CMT Testing
Governor’s Square Mall (Clarksville) – Mill & Paved 5 different areas at different specs., Full depth patching, Seal coated over 124,664 SY, Crack filled 12,000 LF, Line striped entire lot
CarMax (Norcross) – 595,000 sq. ft. project, 2-inch mill and pave for the sales lot and a 4-inch mill and pave for the customer lot
Home Depot (Savannah) – 81,000 SQFT R&R Concrete Project: Removed 12″ of saturated soil and replaced subgrade, Installed 6″ perforated drainpipes draining to a retention pond, Reinforced subgrade with geogrid and 12″ of compacted stone
Cracker Barrell (Kennesaw) – Removed and disposed of existing sidewalk, Topdressed existing stone as required, Formed and poured new 4″ 4000 PSI Class A concrete with a broom finish
Amazon IOS (Stone Mountain) – Light-duty paving, concrete curbs, and heavy-duty concrete installed, Relocated and installed new light poles to improve visibility, Demolished concrete islands and installed ADA-compliant ramps to improve accessibility, Bollards added to protect pedestrian walkways and building perimeters, Reflective, water-based line striping applied
Home Depot Distribution (Locust Grove) – 6″ Mill and Pave using fibers for sustainability, Line striped entire lot
Home Depot Distribution ( McDonough) – 5″ Mill and Pave using fibers for sustainability, Line striped where needed
Estes (Baltimore) – Demolition & Site Preparation, Installed 15″ and 18″ reinforced concrete pipe (RCP), Temporarily removed and reinstalled chain link fence, Performed 2″ mill and pave of designated asphalt areas, Applied fresh line striping across the entire lot, Poured new concrete surfaces and installed new curbing, Supplied and installed new wheel stops throughout parking areas
Safeway (Gaithersburg: 2 locations) – 4″ Mill and Pave, ADA Compliance, Installed new bollards and signage, Removed and replaced concrete sidewalk, curb, and gutter, Line striped entire lot
Extended Stay America (Glen Burnie) – Two-Course Paving Repairs, 5″ Mill and Pave to areas needed, Applied two coats of sealer, Line striped entire lot
XPO (Newark) – 4″ Mill and Pave, 8″ heavy duty concrete replacement, Line striped entire facility and 24 new numbers at the bay doors
Complete site-to-striping build (New Brunswick) – Installed 3″ of binder and paved 2″, 8″ of concrete paving, installed a 4″ concrete sidewalk and curb, installed 8″ dumpster pads, Installed STOP signs and new bollards, Line striped entire lot
Morrisville
Lowes (Robbinsville) – Concrete Demolition
Office Building (West Windsor) – Seal coated (2 layers) entire lot, Crack filled where necessary, Line striped
Lowes – Performed 1.5″ Mill and Pave, Line stripped entire lot
Walmart (Cobblestone) – Pavement replacement that included 16” of pavement, 12” of new stone base, and a 3” binder topped with a 2” fiber-reinforced surface course. Replaced concrete and line stripped the entire lot
Lowes (Glenmont) – Resurfaced Existing Asphalt, Removed & Replaced Concrete Sidewalk, Line Striped entire lot, ADA Compliance
Amazon (Middletown) – 2.5″ mill and pave over 78,923 sq. yds., Removed and replaced 77 speed bumps, Removed and reinstalled existing wheel stops with rear pins, Line striped entire lot
Lowes (Lewes) – Asphalt Resurface, Removed and replaced curb, ADA bollard cover and sign, line striped entire lot
Capital Asphalt Replacement