Gallery
HOA Inlet Repairs


XPO (Newark) – 4″ Mill and Pave, 8″ heavy duty concrete replacement, Line striped entire facility and 24 new numbers at the bay doors
Complete site-to-striping build (New Brunswick) – Installed 3″ of binder and paved 2″, 8″ of concrete paving, installed a 4″ concrete sidewalk and curb, installed 8″ dumpster pads, Installed STOP signs and new bollards, Line striped entire lot
Morrisville
Lowes (Robbinsville) – Concrete Demolition
Amazon (Middletown) – 2.5″ mill and pave over 78,923 sq. yds., Removed and replaced 77 speed bumps, Removed and reinstalled existing wheel stops with rear pins, Line striped entire lot
Lowes (Lewes) – Asphalt Resurface, Removed and replaced curb, ADA bollard cover and sign, line striped entire lot
Cheyney University – Installed new water main, completed sewer and stormwater drainage systems, and constructed new curb and sidewalk
Self Storage (Huntingdon Valley) – 2″ mill and pave over 7,994 Sq Yd, Installed 6.5′ x 6″ concrete-filled steel pipe bollard, Excavated trench up to 18″ deep, backfilled with stone and asphalt, and installed 4″ asphalt with hot tar edges
HOA Community (Phoenixville) – 2″ Mill & Pave of Community Roadways and Parking Lot, Drain Inlet Replacements throughout community, ADA Repairs, Line Striping
Mixed Use Property (Oak Tree Rd.) – 2″ Mill and pave over 28,108 SY of asphalt, Replaced 2.5″ binder course on half the area, Removed and replaced 6,000 SF of sidewalk, Replaced 230 LF of concrete curb for improved drainage and definition
Target (Philadelphia) – 2″ overlay on milled surface, Sidewalk replacement (5″), Curb installation (6″ standard & 4″ surmountable), ADA ramps (Type 1A), Decorative concrete bollards
Elco Highschool (Lancaster) – 2″ Mill and Pave, Installed new wheel stops, Line striped the entire lot and road
Tennis Court (Harrisburg) – 2″ Pave, Applied acrylic resurfacer followed by multiple color coats, Line Striped court, Installed concrete curbs
Capital Asphalt Replacement